Muswellbrook Pumped Hydro EOI

Undisclosed
  • SectorRenewable Energy
  • ClientSamsung Decmil JV
  • Program Value$2B AUD (est.)
  • LocationMuswellbrook, NSW — Hunter Central Coast REZ
  • DurationEOI: Sep–Nov 2024 (2 months)
  • Next PhaseECI: Jul 2025 to Mar 2025 (as provided)
  • ServiceEstimating

Project Description

The Muswellbrook Pumped Hydro Energy Storage Project repurposes the former Muswellbrook Coal Mine into a 400 MW, 3,200 MWh facility that can supply eight hours of dispatchable power. The scheme uses the existing mine void as the lower reservoir and a new upper reservoir on Bells Mountain. Water pumps uphill during low demand and generates through turbines at peaks, operating as a large-scale battery to stabilise the grid.

DEC EOI Support

  • EOI development including preliminary and detailed business case and methodology
  • Quantity surveying and tender preparation
  • Value engineering and cost-saving initiatives
  • Market and subcontractor engagement, vetting and assessment
  • Initial risk assessment and cost-saving options
  • Joint Venture integration and ways of working for the JV team

Indicative Scope Priced

  • Bulk earthworks and site civils / establishments
  • Intake and outlet structures
  • Reservoir lining
  • Rock anchors and shotcrete
  • Temporary works
  • Water intake pipeline
Previous