Upgrade of a critical 1.1 km section between Barware Road and Marshalltown Road. Works widened the corridor from two to four lanes and delivered a new rail-over-road bridge at Marshall to remove the level crossing. The package enhances safety and access through a new shared walking and cycling path, a local service road connection, and corridor-wide lighting, drainage, signage and landscaping.

Key Scope

  • Widening 1.1 km from 2 lanes to 4 lanes
  • New bridge over the railway at Marshall (level crossing removal)
  • Shared user path for walking and cycling
  • Service road linking Norcott Road to Barwon Heads Road
  • New street lighting, signage, drainage and landscaping

Engineering Improvements

  • Bridge redesign from one-span to three-span to reduce ground improvement
  • Minimised utilities relocations
  • Offline bridge construction to maintain traffic flow and reduce disruption

Outcomes

  • Improved safety and local access across the corridor
  • Reduced congestion and more reliable travel times for a growing region